THE
LES MIRANDES STORY- FACTS AND FIGURES
The course has 18 distinctly varying holes laid out as an
executive course i.e. some what shorter than the norm. with
8 par 3s; 9 par 4s; and 1 par 5 for good measure.
The course was designed by Peter Fuller a life long aficionado
and lover of the sport with every hole being taken from
one of the many golf courses around the world that Peter
has played at with
water features, and special planting of specimen trees and
shrubs to compliment the course.
From
conception to completion took 4 and half years to design and construct
although further facilities such as a Canadian style self-catering
golf village with additional swimming pool, pool side wet
bar and mini golf area for youngsters and adults alike,
plus an onsite shop for lifes essentials is planned
at a later date.
Also
a games room is planned, to be constructed alongside the
main Clubhouse facility.
Facts and Figures
Approximately 2000 tons of earth were excavated and moved.
1000 tons of Sand, 750 tons of Gravel and 200 tons of top
soil were imported.
Over
half of a ton of top quality grass seed was used. (Creeping
Bents and Fescues)300 shrubs and trees
were planted.
Approximately 1 kilometre of irrigation and drainage pipe
will be installed.Total investment cost to date approximately.